It's been a few weeks since we've shared news, but things have been moving along!

We are awaiting the issuance of our final permit: a building permit. We expect it any time. Until we get that, our major systems contractors cannot get to work. However, we are doing what we can while we're waiting.

Joe finished taking down the old ceiling in the main first-floor space. That was a BIG job. Rob has started rebuilding the front porch, including ordering some lovely period columns to replace the 4 x 4's that are there currently. He also has metal roofing to replace the old shingles. The front porch is the main entrance to our space, so we want it to be stunning, and Rob is making that happen!

Upstairs, Patti and Cass (and friends!) are stripping wallpaper.... so much wallpaper.... and paint... and more wallpaper. The walls have wallpaper that's been painted over, wallpapered over, and then painted again. We could just paint again, but if you're going to do it, do it right.... so that means stripping! Luckily, the wallpaper is paper, so it does come off with water and scraping. We have been so fortunate to have our friends Gail and Toni come help on the weekends. Here we are scraping a couple of the living room walls.

After stripping the wallpaper and old paint, we are down to the plaster walls, which have to be washed. Gail helped by washing this wall as far up as she could reach (we need a ladder to reach the top of the walls), and you can really tell the difference!

As of this past weekend, we have almost finished the living room and only have two bedrooms left to do.

To keep us motivated, Patti and Toni painted one of the walls in the kitchen. We love it and can't wait to see the rest of the place painted!

We also want to share our plans for after we open. Many of you have asked us when we hope to open. Well, all the red tape has certainly delayed our plans, and although we can't tell you for sure when we'll open, we did want to share more about our plans.

We plan to host a retreat each month. Some of them may have a theme, but many of them will be "open crafting" retreats like the ones for which you may already know us. We also hope to offer classes and open crafting time during the week. However, we will also be looking to rent the space to other groups who'd like to use it.

We have the following weekends penciled in for retreats hosted by us. We plan to open at 8 AM on the first day and allow people to stay until about 5 PM on the last day. All meals and linens (sheets and towels) are included. Our tentative price for these weekends (4 days and 3 nights) will be $350 (plus tax). If you can't come the entire weekend, discounted pricing will be offered. We have single, double, and one triple bedrooms. Once we are able to take reservations, you'll be the first to know!

  • May 24-27 (Memorial Day weekend; Friday - Monday)
  • June 20-23 (Thur-Sun)
  • July 25-28 (Thur-Sun)
  • Aug 30-Sept 2 (Labor Day weekend; Fri-Mon)
  • Oct 24-27 (Thur-Sun)
  • Nov 14-17 (Thur-Sun)
  • We are also planning some exciting things for the week between Christmas and New Year!

Thank you again for all the support you've shown us!

~Patti and Cass

6 South Main St, Mont Alto, PA 17237
Unsubscribe · Preferences

Hi! We are MakerCraft Studio & Retreat Center

To learn about everything we are doing, sign up for our newsletter!

Read more from Hi! We are MakerCraft Studio & Retreat Center

Dear Friends and Supporters, We are excited to let you know that we passed our insulation inspection and drywall has begun! We don't have a lot of photos to share this time because the only visible change has been installation of drywall. Rob, Joe, and Patti first started by installing vapor barrier and then drywall went up. This week, they are taping and mudding the drywall. The addition of drywall has made a huge difference in the feel of the space -- it's getting real! Among the "hidden"...

Dear Friends and Supporters, You haven't heard much from us, because what we've been doing isn't very exciting -- but it's crucial work! The most visible accomplishment was Rob getting our new columns placed on the rebuilt front porch! With our friend Toni's help, the columns and the front door got a first coat of paint. Patti started scraping around the windows on the front of the building. The primary activity over the past two weeks has been insulation installation! All four of us have...

Dear Supporter, This past week, we passed an electrical and framing inspection for the first floor. Yay! So, that means it was time for insulation installation. Yesterday, Patti, Cass, Gail, and Toni (yay, girl-power!) spent the day installing insulation in the walls on the first floor rooms. We still have to do the ceiling on the first floor, but we made good progress! This week, we'll be working on laying the floor in the downstairs kitchen and electrical work will move upstairs. Classes!...